TIDT419
January 2025
1
Description
Features
Applications
1
Test Prerequisites
1.1
Voltage and Current Requirements
1.2
Required Equipment
1.3
Considerations
1.4
Dimensions
1.5
Test Setup
2
Testing and Results
2.1
Efficiency Graphs
2.2
Efficiency Data
2.3
Thermal Images
2.4
Charge Time and Holdup Time
3
Waveforms
3.1
Switching
3.2
Input and Output Voltage Ripple
3.2.1
Buck Converter
3.2.2
Boost Converter
3.3
Load Transients
3.4
Start-up Sequence
Test Report
3.6V, 1A Output Smart Meter Supercapacitor Backup Power Supply Reference Design