TIDT419 January   2025

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  6. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Charge Time and Holdup Time
  7. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Input and Output Voltage Ripple
      1. 3.2.1 Buck Converter
      2. 3.2.2 Boost Converter
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence
Test Report

3.6V, 1A Output Smart Meter Supercapacitor Backup Power Supply Reference Design