TIDT337 may   2023

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
    5. 1.5 Test Setup
  6. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
  7. 3Waveforms
    1. 3.1 Output Current Ripple
Test Report

3-kW, Two-Phase, Interleaved Half-Bridge LLC With GaN and C2000